| Sl.No. |
ComplaintNumber |
Reported Date |
Location |
Complaint Description |
Status |
View |
| 1 |
84 |
15-Jul-08 |
Kolar |
Subramanyam,CCC, PC No. 222,working in Town Police Station, Chintamani, Belonging to Scheduled Caste, not able to stay peacefully in any rented house for long. Applied for police quarters. Being rebuked instead of being considered sympathetically. Request for justice and prays for consideration of his request sympathetically. |
Complaint Resolved |
View |
| 2 |
83 |
14-Jul-08 |
Chitradurga |
Smt Poornima D., w/o Sri C Shivakumar, aged 36 years, s/o Late Sri Chowdaiah, resident of Shirali near Bhatkar, working as teacher in pvt school in Chitradurga, went away on 11-03-08, complaint was registered with Sub-Inspector, Town Police Station, Chitradurga, on 22-04-08.
Requests that he be traced and matter be investigated. |
Complaint Resolved |
View |
| 3 |
81 |
30-Jun-08 |
Davangere. |
Sir,
We are small time Travelservice providers @ Davangere. Apllication, against SHORT TIME TENDER nOTIFICATION/140 dtd;24/06/08 was not allowed,even though the entire Tender was postponed for 01-07-2008. |
Registered |
View |
| 4 |
79 |
24-Jun-08 |
16th B Cross, Yelahanka New Town. |
Dear Sir,
This is to report an illegal commercial construction in progress, in a residential lane. It is rumoured to be a temple or a shop.
It is disheartening to note the speed of the construction, especially when the residents have vehemently opposed it. Once this is completed, it will be impossible to close it, and I request the concerned authorities to take needful action now.
We, the residents of HIG sector, oppose this illegal construction, and we need BBMP to stop it immediately.
Thank you!
Regards,
Residents of HIG 3rd Phase, 16th B Cross, Yelahanka New Town |
Registered |
View |
| 5 |
80 |
24-Jun-08 |
Bijapur. |
Sir, To alert my complaint which is registered online dated 22nd June,requested to follow or inform if there is any other procedure for these type of complaints |
Registered |
View |
| 6 |
78 |
22-Jun-08 |
Bijapur. |
My father in law cheated me of 5 lakh rupees, I am wotking here in Saudi Arab on work permit, as per my wife advice to buy a land, she said me to send sum if 1 lakh rupees and the money which is allready used by her daddy they will use and buy a land, when the money reached her father was telling all the money they got from me is for there daughters security if I need to buy a land then I had to send 3 lakhs more, I am very much helpless as I am from lower middle class family and my father in law is rich, my brother cant fight with them, please help me, my brother there in BJP can give you all the details, my brothers mobile number is also written below for your infomation, please help. |
Registered |
View |
| 7 |
77 |
11-Jun-08 |
Kormangla, Bangalore. |
Today Morning (11/06/2008) we were sleeping and after waking up at 7:00am, we found our mobile have been theft. It happened between 6:30am to 7:00am.
Only two mobiles have been stolen.
Mobile Details
9972477011 - Saurabh Maheshwari
Sony ericcson 550i, Jet Black in Colour,
IMEI No : 35273302-864529-9
9740921227 - Nirmal Thomas
Nokia 3300
Please activate Survilance on the given IMEI No. |
Registered |
View |
| 8 |
76 |
11-Jun-08 |
Kormangla, Bangalore. |
Today Morning (11/06/2008) we were sleeping and after waking up at 7:00am, we found our mobile have been theft. It happened between 6:30am to 7:00am.
Only two mobiles have been stolen.
Mobile Details
9972477011 - Saurabh Maheshwari
Sony ericcson 550i, Jet Black in Colour,
IMEI No : 35273302-864529-9
9740921227 - Nirmal Thomas
Nokia 3300
Please activate Survilance on the given IMEI No. |
Registered |
View |
| 9 |
74 |
30-Apr-08 |
bangalore. |
the corporation has put tar in our road, which is way beyond the quality . it looks like a paper tar,i have taken a picture and am sending the same to the newspaper. the quality of road is worst. they have eaten all the money and laid the worst road with bad quality. |
Registered |
View |
| 10 |
72 |
25-Apr-08 |
Mysore. |
The overhead tanks of some "30 PC and 5 SI Qtrs" and some pipes are broken. Because of this the residence of these quarters are faceing water shortage. The concerned contractor may be requested to repair above defects urgently. |
Complaint Forwarded |
View |
| 11 |
71 |
10-Apr-08 |
Bettadapura, Piriyapatna Tq, Mysore Dist. |
As per a SMS recd from 9901265318 there is reportedly a news item in
Andolana Daily regarding poor quality of work in Periapatna 1 Si and 6 PC quarters. The work has not been taken over due to poor quality. The roof is said to be leaking. Pl take immediate necessary action to set the matter and right and communicate action taken. |
Complaint Resolved |
View |
| 12 |
70 |
10-Mar-08 |
S.T.Bed, Koramangala |
There is a large empty expanse of land right behind the mantri classic apartment complex. This is usually very green as grass and vegetation grows.
There used to be a small pond here too.
There is illegal dumping of construction waste being done in the middle of the night at 2 AM etc - lot of trucks come and dump rubbish in the area.
Now there have been 2-3 fires that have been set in the wild vegetation. This causes a lot of black smoke and pollution.
Can anything be done to stop 1. Illegal dumping 2. The setting of these fires that destroy the whole environment ? |
Registered |
View |
| 13 |
68 |
07-Mar-08 |
Indi-586209 |
Frequently use of loudspeaker for more than 3-4 hours early morning.Location:Birappa Gudi,Birappa nagar,Indi.It loud irritatingly.Mostly on Sundays,holidays Amavsya and like days.Please do the needful and make freedom from this loudspeaker. |
Registered |
View |
| 14 |
69 |
07-Mar-08 |
Indi-586209 |
Frequently use of loudspeaker for more than 3-4 hours early morning.Location:Birappa Gudi,Birappa nagar,Indi.It loud irritatingly.Mostly on Sundays,holidays Amavsya and like days.Please do the needful and make freedom from this loudspeaker. |
Registered |
View |
| 15 |
66 |
19-Feb-08 |
Shimoga. |
Let dt 17-12-2007, recd from Commandant, 8th Battalion, KSRP, Shimoga : That 8 solar lights not functioning, requests for immediate repaif. |
Registered |
View |
| 16 |
67 |
19-Feb-08 |
Ramanagaram. |
Let dt 21-12-07 recd from Suptd, Dist Prison, Ranamanagaram : that due to the 3 days rain in Dec 07, roof of the prison is leaking causing the bulbs and fans to burn out. Request urgent repairs. |
Registered |
View |
| 17 |
65 |
30-Jan-08 |
Mysore. |
Let No.KATTADA/KPA/29/07-08, DT. 11-12-07.
The Hostel Block Nos. 6 & 7 constructed in 2004 have solar water heater, which are totally damaged due to heavy rains and winds, because they were not installed firmly. Also, no lid on overhead tank causing overflowing water draining off onto roof and resulting in dampness and recurring repairs. Action to be taken against the concerned. |
Complaint Forwarded |
View |
| 18 |
75 |
18-Jan-08 |
Kudlu9th BN.KSRPBangalore. |
96 quarters (outoff 148 quarters propossed) were needed to accomadate sportsmen for the sports meat from 03.01.08 to 05.01.08. Concerned AEE has reported that the works are completed. But, there is no Electric supply and many minor fittings and wardrobes have not bean fixed. Hence, the necessary works may be carriedout and fresh report be submitted. |
Registered |
View |
| 19 |
64 |
28-Dec-07 |
Bangalore. |
The web site does not give the latest annual report. This was ased to be uploaded immediately after the accounts were finalised and so far it has not been done. In the home page of KSPHC old annual reports are being referred to. This does not depict a ISO company in good light. |
Complaint Resolved |
View |
| 20 |
73 |
17-Nov-07 |
Chellur, Chickballapur. |
Regarding minor rectification works such as refixing window handles, finishing, crackes on walls, plastring on wires, water stagnating on sajjas, neat painting, etc. |
Complaint Resolved |
View |
| 21 |
61 |
13-Nov-07 |
Malleswaram. |
There is a cellphone tower being consttructed at 22, 7th Main, Malleswaram ( entrance from conservancy road) by Mr. Ashok Kumar on top of his terrace. There is safety adn health issue to neighbours - radiation effect from the tower which could cause cancer and other genetic problems and fire hazard to neighbours due to lack of space around the building for proper earthing or precautions. |
No Action Required |
View |
| 22 |
59 |
06-Nov-07 |
Bangalore |
We have submitted so many letters to you by which we have given you the fact & figures about the subject case and the same has been proved by the documents provided to us under RTI. We again request you to investigate this matter and do not go against the tender norms and pre qualification criteria while further processing of the case for issue of any supply order.For, Jyotech Engg. & Mktg Consultants |
Complaint Resolved |
View |
| 23 |
60 |
06-Nov-07 |
Bangalore |
We have submitted so many letters to you by which we have given you the fact & figures about the subject case and the same has been proved by the documents provided to us under RTI. We again request you to investigate this matter and do not go against the tender norms and pre qualification criteria while further processing of the case for issue of any supply order. For, Jyotech Engg. & Mktg Consultants |
Complaint Resolved |
View |
| 24 |
63 |
06-Sep-07 |
Bangalore. |
We have registered with you,with respect to works related for Security products & we have not recieved the recent tender release date & notification to our mail ID.The tender no.is :PHC/Contracts/Bng/TND/2007-08/624,dated:14.12.2007 for the works related to Commissioner office.What is the use with registration.? |
Complaint Forwarded |
View |
| 25 |
58 |
24-Aug-07 |
Indi, Bijapur |
The constraction of 1si qtrs at Indi in Bijapur District has been completed nealy one year back. The bill is still pending. The contractor is friquently enquring with AEE, EE and AS3 but to no avail. He requests that his bill be settled early.
IP ADDRESS : 59.96.202.129 |
Complaint Resolved |
View |
| 26 |
56 |
27-Jul-07 |
Karnataka Police Academy Guest House, Mysore. |
The Guest House of the Karnataka Police Academy, Mysore has been completed in all respects over 4 months ago, yet has not been handed over due to non connection of water supply. A bore well has been dug and hence water connection could be given to the building in just two days.
Request is made to instruct the concerned to hand over the building in next 10 days. |
Complaint Resolved |
View |
| 27 |
57 |
27-Jul-07 |
13 PC quarters constructed in B. Kanabur, Survey No. 213. |
The under ground cables used in the project for construction of 13 PC quarters constructed 3 years ago has burnt out resulting in disruption of electric supply. JE, MESCOM, Balehonnur has stated in writting vide his letter dated 10.05.07 that danger to life of people of the locality is feared, as a result of defective / burnt out under ground electric cables.
Request is made to instruct the concerned to get the defective cables replaced. |
Complaint Resolved |
View |
| 28 |
47 |
26-Jul-07 |
Bellary, Moka, Hatcholli,Tekkaalakota; Sirigeri,Siruguppa;Hospet;Kottur;Kampli;Kudligi |
In 10 locations of Bellary District where construction work is in progress, the quality of work is not good, walls have developed cracks and curing has not beed done satisfactorily.
Hence, request has been made to instruct KSPHC engineers to ensure that good quality of work is done. |
Registered |
View |
| 29 |
49 |
26-Jul-07 |
Rural Police Station, Tumkur (handed over on 13-10-2005). |
1. There are cracks in several places in the walls of the Rural Police Station, Tumkur,
2. Besides, the ceiling in the computed room and the rest room causing rain water to seep in even during light rains.
Request is made to ask the concerned contractor to effect necessary repairs. |
Registered |
View |
| 30 |
50 |
26-Jul-07 |
8 quarters built for staff of Maski Police Station. |
1.The contractor awarded the contract for the construction of the 8 quarters for staff of the Maski Police Station, stationed in Andhra Pradesh, does not visit the project
2. and has not appointed any engineer or supervisor to supervise the works,
3. no curing is being done for the construction,
4. also no water sump is constructed for use during the construction, bad quality cement and workmanship is being used.
Request is for effective supervision to ensure quality construction. |
Complaint Resolved |
View |
| 31 |
51 |
26-Jul-07 |
8 quarters built for staff of Maski Police Station. |
1.The contractor awarded the contract for the construction of the 8 quarters for staff of the Maski Police Station, stationed in Andhra Pradesh, does not visit the project
2. and has not appointed any engineer or supervisor to supervise the works,
3. no curing is being done for the construction,
4. also no water sump is constructed for use during the construction, bad quality cement and workmanship is being used.
Request is for effective supervision to ensure quality construction. |
Complaint Resolved |
View |
| 32 |
53 |
26-Jul-07 |
Construction works being executed in Kodagu Dist.,. |
1. The construction of quarters and police stations in Kodagu Dist, especially Madikeri and Bagamandala are proceeding slowly,
2. The quality of work is also not satisfactory, photos sent.
Request is made to ensure timely completion of all projects in Kodagu Dist. |
Complaint Forwarded |
View |
| 33 |
55 |
26-Jul-07 |
Quarters constructed for officers and staff of Police Training School, Khanapur. |
Many of the roofs of thequarters constructed for the officers and the staff of the Police Straining School, Khanapur, leak during rainy season.Let dt 9-5-03,8-7-=03,27-9-03 and 4-6-07 have been addressed in this regard.
Request is made to arrange to get the defects repaired through the concerned contractor. |
Complaint Resolved |
View |
| 34 |
48 |
26-Jul-07 |
Dist Police Office, Gadag |
1. The earthing used in the Building is defective, causing short-circuit / disruption of work in the computer centre. The UPS has burnt out due to short-circuit.
2.Rain water is seeping into the computer training centre and damaging the files and UPSs.
Request is for arranging to repair the cracks in the walls to prevent rain water coming in and also to repair the earthing cables etc. |
Registered |
View |
| 35 |
52 |
26-Jul-07 |
Dakshina Kannada Dist Home Guards Building, Mangalore |
The newly constructed Building for the Home Guards at Mangalore has started leaking after light rains. The CD and photos have been submitted to DGP, Home Guards.
Request is made to instruct the concerned conntractor to effect necessary repairs to the building. |
Complaint Resolved |
View |
| 36 |
54 |
26-Jul-07 |
Wireless Repeater Centre, Harti |
The works being executed in Wireless Repeater Centre in Harti, have several defects,which have been communicated to AEE, Hubli,vide letters dt 23-3-07 and 4-7-07, yet they have not been set right.
Request is made to instruct him to arrange to carry out the neccy repairs and to send report to SP, Gadag. |
Complaint Resolved |
View |
| 37 |
43 |
25-Jul-07 |
Alnavara, Dharwad Dist |
Cracks have been reported on the inner and outer walls of the newly constructed 6 PC quarters which have been completed and which come under the PSI, Alnavara Police Station, Dharwad Dist. It is requested by SP, Dharwad, that the repairs be carried out and then only be handed over.
|
Registered |
View |
| 38 |
45 |
25-Jul-07 |
Alnavara, Dharwad Dist |
The two inside and outside walls in the 1 SI and 6 PC quarters have developed cracks and it is requested by the SP, Dharwar Dist, that they be repaired and then only be handed over to the PSI, Alnavara, Dharwar Dist. |
Registered |
View |
| 39 |
46 |
25-Jul-07 |
Munirabad, |
The Munirabad Police Station constructed in 2004 has started from the ceiling and there is dampness on the wall, as reported by DSP, Koppal, vide his let 15-6-07.
Also, the WC constructed on the first floor of the police station has not been constructed properly. |
Registered |
View |
| 40 |
40 |
25-Jul-07 |
Bangalore |
I am unable to register my complaints in your website. Whatever complaints are registered,do not show their latest status of disposal. Will you please look into this and set right. When I go to the discussion link in your website, I see lot of junk there. How can I lodge my views on the discussion forum when the whole place is full of junk? RSK |
Registered |
View |
| 41 |
42 |
25-Jul-07 |
Raichur. |
Sh Basavarajappa, a Centering Contractor, Raichur, has approached KSPHC with a request to instruct one of our contractors, Sri G G Bhat, to arrange to make payment of Rs. 1,49,893/- against centering material supplied by him earlier for one the works undertaken by Sri G G Bhat.
|
Registered |
View |
| 42 |
44 |
25-Jul-07 |
Hoskote Police Station and Quarters constructed for staff of this station. |
I. 1. Some walls of the recently constructed Hosakote Police Station
constructed by Engineers and Engineers, Bangalore, Contractors, have developed cracks, resulting in rain water seeping in; 2. low quality steel windows used and so not able to close them; 3. the tiles used for flooring have come loose; 4. besides, the stone slab used to cover the pit outside the police station has broken, causing foul smell.
II. 1. The newly constructed quarters for the staff of Hoskote Police Station, have developed cracks, causing seeping in of rain water; 2. Doors used for main doors, inside doors, bathroom doors do not have latches/proper fittings,resulting in not being able to bolt the doors from inside;
3. water collects on the stairs and seeps into nearby walls. |
Registered |
View |
| 43 |
41 |
25-Jul-07 |
JP Nagar. |
I am unable to register my complaints in your website. Whatever complaints are registered,do not show their latest status of disposal. Will you please look into this and set right. When I go to the discussion link in your website, I see lot of junk there. How can I lodge my views on the discussion forum when the whole place is full of junk? RSK
|
Registered |
View |
| 44 |
39 |
20-Jul-07 |
RamaSwamy Palya |
Drainage system is not correct in Veerabhadrappa Road. During rains water floods in all houses more than knee level. Very difficult to survive. Possiblity of electric shocks due to overflow of drainage outside and flowing into houses. Please look into this asap. |
Registered |
View |
| 45 |
38 |
16-May-07 |
Chickmagalur |
The construction of 94 PC and 12 SI quarters started about one year ago is incomplete and hence allottment of quarters to police personnel is delayed. The construction may kindly be taken up and completed speedily.(Let BC.5/2007 dt: 5-5-2007; (2) DO let dt: 15-2-2007 and (3) reminder dated 23-4-2007) |
Registered |
View |
| 46 |
37 |
11-May-07 |
BTM Layout, 11th Main 1st Stage |
There is a costruction going since past one year, It have reached to fifth floor. This kind of construction are taking place and some goverment official might be knowing that. Could any body please take action against this construction? |
Registered |
View |
| 47 |
36 |
08-May-07 |
Chamarajanagar |
The DPO building was handed over to the Police Department, Chamarajanagar, on the 27-05-04. But after three years/intervening period rain water has leaked, all lighting equipment are malfunctioning. Also, the white-washing/painting on the outside walls,inside walls and on the doors and windows have faded and give bad appearance. Request was made vide CHANA/KATTADA/33/98/99, dt. 06-07-06, to repaid cracks to stop rainwater leaking, rapair all lighting fittings and get inside walls, outside walls and doors & windows. But, even after one year not attended. |
Complaint Resolved |
View |
| 48 |
35 |
07-May-07 |
Jyothinagar, Mysore |
The construction of 22 subordi-nate quarters started from 28-12-06 to have been completed on the 27-12-07, but has not been completed even after lapse of a further four months. The contractor has not attended even one review meeting in the complainants office.(Ref CB/CP/2006-2007,dt 23-04-07). |
Registered |
View |
| 49 |
34 |
05-May-07 |
G.B.PALYA |
The residence of GBPALYA which is on Hosur Main Road are facing many civic issues. Mainly the roads (CLAY ROADS) are a major threat to the civilians of this area. There are couple of big schools like "MAHA HIGH SCHOOL" , "ST MARYS SCHOOL".. where i daily see kids facing problems during rain seasons. I kindly request the authorities inchare to look into this and help the people of GBPALYA by providing a good road facility. I ppreciate if you could start of work imm before summer ends.
Thanks for your co-operation
|
Registered |
View |
| 50 |
33 |
09-Mar-07 |
Bannergatta |
We NRI have bought around 110 plots in Nobel Nagar-Bannergatta, Kottigare village. A brick factory guy has set up a brick factory on our land. At present he is taking soil from our land. He does not allow any of us to approach our site. We want him to stop extracting soil from our land and remove his brick factory. I had lodged complaint in year 2000 with Bannergatta police station. But the brick factory guy is not bothered about the complaint. We NRI can not visit India very often neither can opt for a reprehensible act. We need your help to stop illegal extraction of soil from the land.
Further details can be obtained from Mr Sashibhushan based in Bangalore. He can be contacted on Phone OFC.-22276932,Res-22239124 |
Complaint Forwarded |
View |
| 51 |
30 |
07-Feb-07 |
Hubli-Dharwad |
Regarding construction of 60 quarters for police personel at Unkal, Hubli and 6 SI quarters at Dharwad is not yet completed and the contractor is not doing his work sincerely. Hence necessary instructions may please be given to the constructor to take up the work fastly. |
Registered |
View |
| 52 |
31 |
07-Feb-07 |
Hubli-Dharwad |
White Washing of the building of the office of the COP, Hubli-Dharwad. Since the building is constructed during the year 2004, It is badly required painting works and some of the minor repairs pertaining to building. Necessary instructions may please be given to concern authorities to take up the work immediately under intimation. |
Registered |
View |
| 53 |
29 |
22-Jan-07 |
Madanahipparagi Basavakalyana |
Complained received from Sri B.R.Patil, MLA as followsk:-
1. Police Station at Madanahipparagi is still not yet completed since it is Central Govt. Scheme.
2. Police Station constructed at Madanahipparagi in place of Basavakalyana
3. A compound has to be constructed at Aland Police Station Area which is 2 Acres already encroached upon
4. Uncompleted Police Station at Nimbarga has to be hand over to the Police Department.
|
Complaint Resolved |
View |
| 54 |
28 |
27-Nov-06 |
1 SI Qtrs. near Shanivarsante Police Stn. |
The building constructed has bad/defective workmanship, materials.Hence repairs needed. |
Complaint Forwarded |
View |
| 55 |
18 |
08-Nov-06 |
Bangalore |
You are not attending to the complaint. The last few months complaints are simply registered but no action seems to be taken. Will you pl update the action taken by you on the registered complaints. RSK |
Complaint Resolved |
View |
| 56 |
26 |
26-Sep-06 |
Bidar |
Lack of water supply, Electric Supply and incomplete wiring work to be completed. |
Complaint Forwarded |
View |
| 57 |
22 |
01-Aug-06 |
Hariharapura and Koppa |
Regarding roof leaking of Hariharapura P.S and C.P.I office and Koppa P.S |
Complaint Resolved |
View |
| 58 |
25 |
26-Jul-06 |
FingerPrint Bureau Madiwala Bangalore |
Incomplete works in respect of civil, electrical lab coupling works - to be completed. |
Complaint Resolved |
View |
| 59 |
16 |
25-Jul-06 |
Mulbagil |
Regarding repair to Police Qtrs. |
Complaint Forwarded |
View |
| 60 |
17 |
25-Jul-06 |
Kanakapura |
Regarding leakage in the roofs of the newly built Qtrs. |
Complaint Forwarded |
View |
| 61 |
21 |
24-Jul-06 |
KGF |
Regading fixing of submercible pump to the borewell and making provision for RWH for newly built DPO building |
Registered |
View |
| 62 |
13 |
21-Jul-06 |
Bangalore |
My Complaint is this that the position of street in my area is too ill built to explain it is inviting an accident every time. Please have a look on the problem.
|
No Action Required |
View |
| 63 |
20 |
18-Jul-06 |
Nandini layout, Bangalore |
Regarding Roof leaking of Nandini layout PS. |
Complaint Resolved |
View |
| 64 |
19 |
11-Jul-06 |
Haveri |
Regading construction of Prison at Haveri. |
Complaint Forwarded |
View |
| 65 |
23 |
10-Jul-06 |
Juvenile Offences Dharwad |
The proposed modernisation of Haveri district prisons building under perspective plan |
Complaint Forwarded |
View |
| 66 |
24 |
06-Jul-06 |
Hassan |
To carry out repairs Defects to Gonikoppa and Ponnampet Police stations |
Complaint Forwarded |
View |
| 67 |
14 |
06-Jul-06 |
Konaje, Mangalore |
Regarding substandard construction of Qtrs for Konaje Police Station staff. |
Complaint Resolved |
View |
| 68 |
15 |
06-Jul-06 |
Belthangadi, DK Dist. |
Regarding Substandard construction of Beltangadi PS staff Qtrs. |
Complaint Forwarded |
View |
| 69 |
12 |
29-Jun-06 |
Hadagali |
The Home Minister of Karnataka pointed out that the newly constructed CPI office at Hadagali had a leaky roof that needs to be attended to at once. The contractor who built this may be asked to rectify the defect as the office is under warranty period. Action needs to be taken to fix responsibility for the lapse against the engineers at site for sloppy supervision. |
Complaint Resolved |
View |
| 70 |
11 |
16-Jun-06 |
Mysore Road, Sirsi Circle |
Roads in CAR Police Qts are in pathetic condition.
TAR raod was supposed to be laid here..but the authorities have failed to complete their work.
Its been more than fifteen year now and they have not turned up to lay the TAR. Right now its just a mud raod with stones,pathholes,etc.. |
No Action Required |
View |
| 71 |
27 |
11-Jun-06 |
MSR nagar |
Underground drainage being clogged, repairs requested. |
No Action Required |
View |
| 72 |
9 |
02-Feb-06 |
Mysore |
the building is not constructed accroding to plan. |
Complaint Resolved |
View |
| 73 |
10 |
14-Jan-06 |
Madiwala |
water is leaking from madiwala police satation building sanitation pipe. |
Details Required |
View |
| 74 |
8 |
07-Jan-06 |
Bangalore |
UPS that are purchased are not giving full backup support at the time of power failure. |
No Action Required |
View |
| 75 |
7 |
05-Feb-05 |
Bagalkote |
About the installation of a fan in Mahalingapura Police Station. |
Complaint Forwarded |
View |
| 76 |
5 |
02-Feb-05 |
Hassan |
Quality of work done in the construction of quarters at Kushalnagar and Dy.SP and CPI Offices not satisfactory and number of complaints observed. |
Complaint Forwarded |
View |
| 77 |
4 |
22-Jan-05 |
Bangalore |
Construction of Toilets,
Construction of shelter for petrol bunk,
Service Station,
Repair of Pump House.
|
Complaint Forwarded |
View |
| 78 |
2 |
10-Jan-05 |
Bagalkote |
Matter connected to fans inastalled in DPO, Bagalkote. |
Complaint Forwarded |
View |
| 79 |
3 |
10-Jan-05 |
Bangalore |
Cracked wall/ceiling and leakage of water. |
Complaint Forwarded |
View |
| 80 |
6 |
05-Jan-05 |
Bagalkote |
Unsatisfactory quality of work done in the newly constructed Mobile Station, Bagalkote.
Rain water harvesting is not done,
Structural crack observed,
Tiles, joints. |
No Action Required |
View |
| 81 |
1 |
04-Jan-05 |
Hungund Police Quarters |
The matter regarding drainage |
Complaint Resolved |
View |