KSPHC Complaint Book




Sl.No. ComplaintNumber Reported Date Location Complaint Description Status View
1 84 15-Jul-08 Kolar Subramanyam,CCC, PC No. 222,working in Town Police Station, Chintamani, Belonging to Scheduled Caste, not able to stay peacefully in any rented house for long. Applied for police quarters. Being rebuked instead of being considered sympathetically. Request for justice and prays for consideration of his request sympathetically. Complaint Resolved View
2 83 14-Jul-08 Chitradurga Smt Poornima D., w/o Sri C Shivakumar, aged 36 years, s/o Late Sri Chowdaiah, resident of Shirali near Bhatkar, working as teacher in pvt school in Chitradurga, went away on 11-03-08, complaint was registered with Sub-Inspector, Town Police Station, Chitradurga, on 22-04-08. Requests that he be traced and matter be investigated. Complaint Resolved View
3 81 30-Jun-08 Davangere. Sir, We are small time Travelservice providers @ Davangere. Apllication, against SHORT TIME TENDER nOTIFICATION/140 dtd;24/06/08 was not allowed,even though the entire Tender was postponed for 01-07-2008. Registered View
4 79 24-Jun-08 16th B Cross, Yelahanka New Town. Dear Sir, This is to report an illegal commercial construction in progress, in a residential lane. It is rumoured to be a temple or a shop. It is disheartening to note the speed of the construction, especially when the residents have vehemently opposed it. Once this is completed, it will be impossible to close it, and I request the concerned authorities to take needful action now. We, the residents of HIG sector, oppose this illegal construction, and we need BBMP to stop it immediately. Thank you! Regards, Residents of HIG 3rd Phase, 16th B Cross, Yelahanka New Town Registered View
5 80 24-Jun-08 Bijapur. Sir, To alert my complaint which is registered online dated 22nd June,requested to follow or inform if there is any other procedure for these type of complaints Registered View
6 78 22-Jun-08 Bijapur. My father in law cheated me of 5 lakh rupees, I am wotking here in Saudi Arab on work permit, as per my wife advice to buy a land, she said me to send sum if 1 lakh rupees and the money which is allready used by her daddy they will use and buy a land, when the money reached her father was telling all the money they got from me is for there daughters security if I need to buy a land then I had to send 3 lakhs more, I am very much helpless as I am from lower middle class family and my father in law is rich, my brother cant fight with them, please help me, my brother there in BJP can give you all the details, my brothers mobile number is also written below for your infomation, please help. Registered View
7 77 11-Jun-08 Kormangla, Bangalore. Today Morning (11/06/2008) we were sleeping and after waking up at 7:00am, we found our mobile have been theft. It happened between 6:30am to 7:00am. Only two mobiles have been stolen. Mobile Details 9972477011 - Saurabh Maheshwari Sony ericcson 550i, Jet Black in Colour, IMEI No : 35273302-864529-9 9740921227 - Nirmal Thomas Nokia 3300 Please activate Survilance on the given IMEI No. Registered View
8 76 11-Jun-08 Kormangla, Bangalore. Today Morning (11/06/2008) we were sleeping and after waking up at 7:00am, we found our mobile have been theft. It happened between 6:30am to 7:00am. Only two mobiles have been stolen. Mobile Details 9972477011 - Saurabh Maheshwari Sony ericcson 550i, Jet Black in Colour, IMEI No : 35273302-864529-9 9740921227 - Nirmal Thomas Nokia 3300 Please activate Survilance on the given IMEI No. Registered View
9 74 30-Apr-08 bangalore. the corporation has put tar in our road, which is way beyond the quality . it looks like a paper tar,i have taken a picture and am sending the same to the newspaper. the quality of road is worst. they have eaten all the money and laid the worst road with bad quality. Registered View
10 72 25-Apr-08 Mysore. The overhead tanks of some "30 PC and 5 SI Qtrs" and some pipes are broken. Because of this the residence of these quarters are faceing water shortage. The concerned contractor may be requested to repair above defects urgently. Complaint Forwarded View
11 71 10-Apr-08 Bettadapura, Piriyapatna Tq, Mysore Dist. As per a SMS recd from 9901265318 there is reportedly a news item in Andolana Daily regarding poor quality of work in Periapatna 1 Si and 6 PC quarters. The work has not been taken over due to poor quality. The roof is said to be leaking. Pl take immediate necessary action to set the matter and right and communicate action taken. Complaint Resolved View
12 70 10-Mar-08 S.T.Bed, Koramangala There is a large empty expanse of land right behind the mantri classic apartment complex. This is usually very green as grass and vegetation grows. There used to be a small pond here too. There is illegal dumping of construction waste being done in the middle of the night at 2 AM etc - lot of trucks come and dump rubbish in the area. Now there have been 2-3 fires that have been set in the wild vegetation. This causes a lot of black smoke and pollution. Can anything be done to stop 1. Illegal dumping 2. The setting of these fires that destroy the whole environment ? Registered View
13 68 07-Mar-08 Indi-586209 Frequently use of loudspeaker for more than 3-4 hours early morning.Location:Birappa Gudi,Birappa nagar,Indi.It loud irritatingly.Mostly on Sundays,holidays Amavsya and like days.Please do the needful and make freedom from this loudspeaker. Registered View
14 69 07-Mar-08 Indi-586209 Frequently use of loudspeaker for more than 3-4 hours early morning.Location:Birappa Gudi,Birappa nagar,Indi.It loud irritatingly.Mostly on Sundays,holidays Amavsya and like days.Please do the needful and make freedom from this loudspeaker. Registered View
15 66 19-Feb-08 Shimoga. Let dt 17-12-2007, recd from Commandant, 8th Battalion, KSRP, Shimoga : That 8 solar lights not functioning, requests for immediate repaif. Registered View
16 67 19-Feb-08 Ramanagaram. Let dt 21-12-07 recd from Suptd, Dist Prison, Ranamanagaram : that due to the 3 days rain in Dec 07, roof of the prison is leaking causing the bulbs and fans to burn out. Request urgent repairs. Registered View
17 65 30-Jan-08 Mysore. Let No.KATTADA/KPA/29/07-08, DT. 11-12-07. The Hostel Block Nos. 6 & 7 constructed in 2004 have solar water heater, which are totally damaged due to heavy rains and winds, because they were not installed firmly. Also, no lid on overhead tank causing overflowing water draining off onto roof and resulting in dampness and recurring repairs. Action to be taken against the concerned. Complaint Forwarded View
18 75 18-Jan-08 Kudlu9th BN.KSRPBangalore. 96 quarters (outoff 148 quarters propossed) were needed to accomadate sportsmen for the sports meat from 03.01.08 to 05.01.08. Concerned AEE has reported that the works are completed. But, there is no Electric supply and many minor fittings and wardrobes have not bean fixed. Hence, the necessary works may be carriedout and fresh report be submitted. Registered View
19 64 28-Dec-07 Bangalore. The web site does not give the latest annual report. This was ased to be uploaded immediately after the accounts were finalised and so far it has not been done. In the home page of KSPHC old annual reports are being referred to. This does not depict a ISO company in good light. Complaint Resolved View
20 73 17-Nov-07 Chellur, Chickballapur. Regarding minor rectification works such as refixing window handles, finishing, crackes on walls, plastring on wires, water stagnating on sajjas, neat painting, etc. Complaint Resolved View
21 61 13-Nov-07 Malleswaram. There is a cellphone tower being consttructed at 22, 7th Main, Malleswaram ( entrance from conservancy road) by Mr. Ashok Kumar on top of his terrace. There is safety adn health issue to neighbours - radiation effect from the tower which could cause cancer and other genetic problems and fire hazard to neighbours due to lack of space around the building for proper earthing or precautions. No Action Required View
22 59 06-Nov-07 Bangalore We have submitted so many letters to you by which we have given you the fact & figures about the subject case and the same has been proved by the documents provided to us under RTI. We again request you to investigate this matter and do not go against the tender norms and pre qualification criteria while further processing of the case for issue of any supply order.For, Jyotech Engg. & Mktg Consultants Complaint Resolved View
23 60 06-Nov-07 Bangalore We have submitted so many letters to you by which we have given you the fact & figures about the subject case and the same has been proved by the documents provided to us under RTI. We again request you to investigate this matter and do not go against the tender norms and pre qualification criteria while further processing of the case for issue of any supply order. For, Jyotech Engg. & Mktg Consultants Complaint Resolved View
24 63 06-Sep-07 Bangalore. We have registered with you,with respect to works related for Security products & we have not recieved the recent tender release date & notification to our mail ID.The tender no.is :PHC/Contracts/Bng/TND/2007-08/624,dated:14.12.2007 for the works related to Commissioner office.What is the use with registration.? Complaint Forwarded View
25 58 24-Aug-07 Indi, Bijapur The constraction of 1si qtrs at Indi in Bijapur District has been completed nealy one year back. The bill is still pending. The contractor is friquently enquring with AEE, EE and AS3 but to no avail. He requests that his bill be settled early. IP ADDRESS : 59.96.202.129 Complaint Resolved View
26 56 27-Jul-07 Karnataka Police Academy Guest House, Mysore. The Guest House of the Karnataka Police Academy, Mysore has been completed in all respects over 4 months ago, yet has not been handed over due to non connection of water supply. A bore well has been dug and hence water connection could be given to the building in just two days. Request is made to instruct the concerned to hand over the building in next 10 days. Complaint Resolved View
27 57 27-Jul-07 13 PC quarters constructed in B. Kanabur, Survey No. 213. The under ground cables used in the project for construction of 13 PC quarters constructed 3 years ago has burnt out resulting in disruption of electric supply. JE, MESCOM, Balehonnur has stated in writting vide his letter dated 10.05.07 that danger to life of people of the locality is feared, as a result of defective / burnt out under ground electric cables. Request is made to instruct the concerned to get the defective cables replaced. Complaint Resolved View
28 47 26-Jul-07 Bellary, Moka, Hatcholli,Tekkaalakota; Sirigeri,Siruguppa;Hospet;Kottur;Kampli;Kudligi In 10 locations of Bellary District where construction work is in progress, the quality of work is not good, walls have developed cracks and curing has not beed done satisfactorily. Hence, request has been made to instruct KSPHC engineers to ensure that good quality of work is done. Registered View
29 49 26-Jul-07 Rural Police Station, Tumkur (handed over on 13-10-2005). 1. There are cracks in several places in the walls of the Rural Police Station, Tumkur, 2. Besides, the ceiling in the computed room and the rest room causing rain water to seep in even during light rains. Request is made to ask the concerned contractor to effect necessary repairs. Registered View
30 50 26-Jul-07 8 quarters built for staff of Maski Police Station. 1.The contractor awarded the contract for the construction of the 8 quarters for staff of the Maski Police Station, stationed in Andhra Pradesh, does not visit the project 2. and has not appointed any engineer or supervisor to supervise the works, 3. no curing is being done for the construction, 4. also no water sump is constructed for use during the construction, bad quality cement and workmanship is being used. Request is for effective supervision to ensure quality construction. Complaint Resolved View
31 51 26-Jul-07 8 quarters built for staff of Maski Police Station. 1.The contractor awarded the contract for the construction of the 8 quarters for staff of the Maski Police Station, stationed in Andhra Pradesh, does not visit the project 2. and has not appointed any engineer or supervisor to supervise the works, 3. no curing is being done for the construction, 4. also no water sump is constructed for use during the construction, bad quality cement and workmanship is being used. Request is for effective supervision to ensure quality construction. Complaint Resolved View
32 53 26-Jul-07 Construction works being executed in Kodagu Dist.,. 1. The construction of quarters and police stations in Kodagu Dist, especially Madikeri and Bagamandala are proceeding slowly, 2. The quality of work is also not satisfactory, photos sent. Request is made to ensure timely completion of all projects in Kodagu Dist. Complaint Forwarded View
33 55 26-Jul-07 Quarters constructed for officers and staff of Police Training School, Khanapur. Many of the roofs of thequarters constructed for the officers and the staff of the Police Straining School, Khanapur, leak during rainy season.Let dt 9-5-03,8-7-=03,27-9-03 and 4-6-07 have been addressed in this regard. Request is made to arrange to get the defects repaired through the concerned contractor. Complaint Resolved View
34 48 26-Jul-07 Dist Police Office, Gadag 1. The earthing used in the Building is defective, causing short-circuit / disruption of work in the computer centre. The UPS has burnt out due to short-circuit. 2.Rain water is seeping into the computer training centre and damaging the files and UPSs. Request is for arranging to repair the cracks in the walls to prevent rain water coming in and also to repair the earthing cables etc. Registered View
35 52 26-Jul-07 Dakshina Kannada Dist Home Guards Building, Mangalore The newly constructed Building for the Home Guards at Mangalore has started leaking after light rains. The CD and photos have been submitted to DGP, Home Guards. Request is made to instruct the concerned conntractor to effect necessary repairs to the building. Complaint Resolved View
36 54 26-Jul-07 Wireless Repeater Centre, Harti The works being executed in Wireless Repeater Centre in Harti, have several defects,which have been communicated to AEE, Hubli,vide letters dt 23-3-07 and 4-7-07, yet they have not been set right. Request is made to instruct him to arrange to carry out the neccy repairs and to send report to SP, Gadag. Complaint Resolved View
37 43 25-Jul-07 Alnavara, Dharwad Dist Cracks have been reported on the inner and outer walls of the newly constructed 6 PC quarters which have been completed and which come under the PSI, Alnavara Police Station, Dharwad Dist. It is requested by SP, Dharwad, that the repairs be carried out and then only be handed over. Registered View
38 45 25-Jul-07 Alnavara, Dharwad Dist The two inside and outside walls in the 1 SI and 6 PC quarters have developed cracks and it is requested by the SP, Dharwar Dist, that they be repaired and then only be handed over to the PSI, Alnavara, Dharwar Dist. Registered View
39 46 25-Jul-07 Munirabad, The Munirabad Police Station constructed in 2004 has started from the ceiling and there is dampness on the wall, as reported by DSP, Koppal, vide his let 15-6-07. Also, the WC constructed on the first floor of the police station has not been constructed properly. Registered View
40 40 25-Jul-07 Bangalore I am unable to register my complaints in your website. Whatever complaints are registered,do not show their latest status of disposal. Will you please look into this and set right. When I go to the discussion link in your website, I see lot of junk there. How can I lodge my views on the discussion forum when the whole place is full of junk? RSK Registered View
41 42 25-Jul-07 Raichur. Sh Basavarajappa, a Centering Contractor, Raichur, has approached KSPHC with a request to instruct one of our contractors, Sri G G Bhat, to arrange to make payment of Rs. 1,49,893/- against centering material supplied by him earlier for one the works undertaken by Sri G G Bhat. Registered View
42 44 25-Jul-07 Hoskote Police Station and Quarters constructed for staff of this station. I. 1. Some walls of the recently constructed Hosakote Police Station constructed by Engineers and Engineers, Bangalore, Contractors, have developed cracks, resulting in rain water seeping in; 2. low quality steel windows used and so not able to close them; 3. the tiles used for flooring have come loose; 4. besides, the stone slab used to cover the pit outside the police station has broken, causing foul smell. II. 1. The newly constructed quarters for the staff of Hoskote Police Station, have developed cracks, causing seeping in of rain water; 2. Doors used for main doors, inside doors, bathroom doors do not have latches/proper fittings,resulting in not being able to bolt the doors from inside; 3. water collects on the stairs and seeps into nearby walls. Registered View
43 41 25-Jul-07 JP Nagar. I am unable to register my complaints in your website. Whatever complaints are registered,do not show their latest status of disposal. Will you please look into this and set right. When I go to the discussion link in your website, I see lot of junk there. How can I lodge my views on the discussion forum when the whole place is full of junk? RSK Registered View
44 39 20-Jul-07 RamaSwamy Palya Drainage system is not correct in Veerabhadrappa Road. During rains water floods in all houses more than knee level. Very difficult to survive. Possiblity of electric shocks due to overflow of drainage outside and flowing into houses. Please look into this asap. Registered View
45 38 16-May-07 Chickmagalur The construction of 94 PC and 12 SI quarters started about one year ago is incomplete and hence allottment of quarters to police personnel is delayed. The construction may kindly be taken up and completed speedily.(Let BC.5/2007 dt: 5-5-2007; (2) DO let dt: 15-2-2007 and (3) reminder dated 23-4-2007) Registered View
46 37 11-May-07 BTM Layout, 11th Main 1st Stage There is a costruction going since past one year, It have reached to fifth floor. This kind of construction are taking place and some goverment official might be knowing that. Could any body please take action against this construction? Registered View
47 36 08-May-07 Chamarajanagar The DPO building was handed over to the Police Department, Chamarajanagar, on the 27-05-04. But after three years/intervening period rain water has leaked, all lighting equipment are malfunctioning. Also, the white-washing/painting on the outside walls,inside walls and on the doors and windows have faded and give bad appearance. Request was made vide CHANA/KATTADA/33/98/99, dt. 06-07-06, to repaid cracks to stop rainwater leaking, rapair all lighting fittings and get inside walls, outside walls and doors & windows. But, even after one year not attended. Complaint Resolved View
48 35 07-May-07 Jyothinagar, Mysore The construction of 22 subordi-nate quarters started from 28-12-06 to have been completed on the 27-12-07, but has not been completed even after lapse of a further four months. The contractor has not attended even one review meeting in the complainants office.(Ref CB/CP/2006-2007,dt 23-04-07). Registered View
49 34 05-May-07 G.B.PALYA The residence of GBPALYA which is on Hosur Main Road are facing many civic issues. Mainly the roads (CLAY ROADS) are a major threat to the civilians of this area. There are couple of big schools like "MAHA HIGH SCHOOL" , "ST MARYS SCHOOL".. where i daily see kids facing problems during rain seasons. I kindly request the authorities inchare to look into this and help the people of GBPALYA by providing a good road facility. I ppreciate if you could start of work imm before summer ends. Thanks for your co-operation Registered View
50 33 09-Mar-07 Bannergatta We NRI have bought around 110 plots in Nobel Nagar-Bannergatta, Kottigare village. A brick factory guy has set up a brick factory on our land. At present he is taking soil from our land. He does not allow any of us to approach our site. We want him to stop extracting soil from our land and remove his brick factory. I had lodged complaint in year 2000 with Bannergatta police station. But the brick factory guy is not bothered about the complaint. We NRI can not visit India very often neither can opt for a reprehensible act. We need your help to stop illegal extraction of soil from the land. Further details can be obtained from Mr Sashibhushan based in Bangalore. He can be contacted on Phone OFC.-22276932,Res-22239124 Complaint Forwarded View
51 30 07-Feb-07 Hubli-Dharwad Regarding construction of 60 quarters for police personel at Unkal, Hubli and 6 SI quarters at Dharwad is not yet completed and the contractor is not doing his work sincerely. Hence necessary instructions may please be given to the constructor to take up the work fastly. Registered View
52 31 07-Feb-07 Hubli-Dharwad White Washing of the building of the office of the COP, Hubli-Dharwad. Since the building is constructed during the year 2004, It is badly required painting works and some of the minor repairs pertaining to building. Necessary instructions may please be given to concern authorities to take up the work immediately under intimation. Registered View
53 29 22-Jan-07 Madanahipparagi Basavakalyana Complained received from Sri B.R.Patil, MLA as followsk:- 1. Police Station at Madanahipparagi is still not yet completed since it is Central Govt. Scheme. 2. Police Station constructed at Madanahipparagi in place of Basavakalyana 3. A compound has to be constructed at Aland Police Station Area which is 2 Acres already encroached upon 4. Uncompleted Police Station at Nimbarga has to be hand over to the Police Department. Complaint Resolved View
54 28 27-Nov-06 1 SI Qtrs. near Shanivarsante Police Stn. The building constructed has bad/defective workmanship, materials.Hence repairs needed. Complaint Forwarded View
55 18 08-Nov-06 Bangalore You are not attending to the complaint. The last few months complaints are simply registered but no action seems to be taken. Will you pl update the action taken by you on the registered complaints. RSK Complaint Resolved View
56 26 26-Sep-06 Bidar Lack of water supply, Electric Supply and incomplete wiring work to be completed. Complaint Forwarded View
57 22 01-Aug-06 Hariharapura and Koppa Regarding roof leaking of Hariharapura P.S and C.P.I office and Koppa P.S Complaint Resolved View
58 25 26-Jul-06 FingerPrint Bureau Madiwala Bangalore Incomplete works in respect of civil, electrical lab coupling works - to be completed. Complaint Resolved View
59 16 25-Jul-06 Mulbagil Regarding repair to Police Qtrs. Complaint Forwarded View
60 17 25-Jul-06 Kanakapura Regarding leakage in the roofs of the newly built Qtrs. Complaint Forwarded View
61 21 24-Jul-06 KGF Regading fixing of submercible pump to the borewell and making provision for RWH for newly built DPO building Registered View
62 13 21-Jul-06 Bangalore My Complaint is this that the position of street in my area is too ill built to explain it is inviting an accident every time. Please have a look on the problem. No Action Required View
63 20 18-Jul-06 Nandini layout, Bangalore Regarding Roof leaking of Nandini layout PS. Complaint Resolved View
64 19 11-Jul-06 Haveri Regading construction of Prison at Haveri. Complaint Forwarded View
65 23 10-Jul-06 Juvenile Offences Dharwad The proposed modernisation of Haveri district prisons building under perspective plan Complaint Forwarded View
66 24 06-Jul-06 Hassan To carry out repairs Defects to Gonikoppa and Ponnampet Police stations Complaint Forwarded View
67 14 06-Jul-06 Konaje, Mangalore Regarding substandard construction of Qtrs for Konaje Police Station staff. Complaint Resolved View
68 15 06-Jul-06 Belthangadi, DK Dist. Regarding Substandard construction of Beltangadi PS staff Qtrs. Complaint Forwarded View
69 12 29-Jun-06 Hadagali The Home Minister of Karnataka pointed out that the newly constructed CPI office at Hadagali had a leaky roof that needs to be attended to at once. The contractor who built this may be asked to rectify the defect as the office is under warranty period. Action needs to be taken to fix responsibility for the lapse against the engineers at site for sloppy supervision. Complaint Resolved View
70 11 16-Jun-06 Mysore Road, Sirsi Circle Roads in CAR Police Qts are in pathetic condition. TAR raod was supposed to be laid here..but the authorities have failed to complete their work. Its been more than fifteen year now and they have not turned up to lay the TAR. Right now its just a mud raod with stones,pathholes,etc.. No Action Required View
71 27 11-Jun-06 MSR nagar Underground drainage being clogged, repairs requested. No Action Required View
72 9 02-Feb-06 Mysore the building is not constructed accroding to plan. Complaint Resolved View
73 10 14-Jan-06 Madiwala water is leaking from madiwala police satation building sanitation pipe. Details Required View
74 8 07-Jan-06 Bangalore UPS that are purchased are not giving full backup support at the time of power failure. No Action Required View
75 7 05-Feb-05 Bagalkote About the installation of a fan in Mahalingapura Police Station. Complaint Forwarded View
76 5 02-Feb-05 Hassan Quality of work done in the construction of quarters at Kushalnagar and Dy.SP and CPI Offices not satisfactory and number of complaints observed. Complaint Forwarded View
77 4 22-Jan-05 Bangalore Construction of Toilets, Construction of shelter for petrol bunk, Service Station, Repair of Pump House. Complaint Forwarded View
78 2 10-Jan-05 Bagalkote Matter connected to fans inastalled in DPO, Bagalkote. Complaint Forwarded View
79 3 10-Jan-05 Bangalore Cracked wall/ceiling and leakage of water. Complaint Forwarded View
80 6 05-Jan-05 Bagalkote Unsatisfactory quality of work done in the newly constructed Mobile Station, Bagalkote. Rain water harvesting is not done, Structural crack observed, Tiles, joints. No Action Required View
81 1 04-Jan-05 Hungund Police Quarters The matter regarding drainage Complaint Resolved View